WestRock & CFNP:
Productivity Through Partnership

Optimizing operations through specialized engineering and local commitment in the paper and packaging industry

The Challenge

Every Minute of
Downtime Matters

In the paper industry, every unplanned shutdown leads to significant
costs at the Westrock plant in La Tuque; a single day of interruption can
result in losses of several thousand dollars.

Challenges We Faced

Precision Execution

Fabrication of steel structures and replacement of critical equipment across diverse industrial projects.

Modernization

Modernization of the safety guards on two critical paper machines as part of a multi-year project (2023-2026)

Operational Continuity

Ongoing maintenance with rapid emergency response to reduce downtime and protect production.

CFNP: More than a supplier a
trusted local partner

CFNP: More than a supplier a trusted local partner

A partnership based on trust, transparency and proven technical expertise.

Partnership Value in Action

How CFNP delivers measurable impact on WestRock

Exceptional Responsiveness

Exceptional
Responsiveness

Critical parts replaced within 24 hours to minimize downtime.

Technical Expertise

Technical
Expertise

Proven expertise ensures compliant, high-quality solutions.

Collaborative Approach

Collaborative
Approach

Direct communication enables faster, more effective resolution.

Local Commitment

Local
Commitment

A strong local partnership built on trust and proximity.

A Reliable Partnership.
A Tangible Impact

Enhanced Safety

Enhanced Safety

The modernization project (2023–2026) is progressing as planned, ensuring compliance with the strictest safety standards, without interruption of production.

Losses Minimized

Losses Minimized

Thanks to the responsiveness of its partner, Westrock avoided prolonged shutdowns, thus preserving the profitability of the factory.

Trusted Partnership

Trusted Partnership

After 10 years of collaboration, Westrock considers CFNP a strategic extension of its maintenance team.

```

Why Leaders Like WestRock Choose CFNP

Building a partnership with us means investing in the longevity and efficiency of your industrial assets.

01

Complete Solution

A single partner for manufacturing, installation, and industrial projects

02

Proven Reliability

Demonstrable response times in critical emergencies.

03

Industrial Expertise

Solid experience in manufacturing, maintenance, and machining

Industrial Partnership Handshake

Testimonials That Inspire Confidence

“CF Nicolas Potvin delivered exactly what they promised: precision, quality, and reliability. From planning to execution, the team showed strong technical expertise and clear communication. Our project was completed on time and exceeded our expectations.”

Marc-André, Maintenance Planner, Westrock La Tuque